Overview Details BSKYB Central Logistic Centre London BrightSpace were appointed by Bourne Parking to undertake architectural services and technical delivery for RIBA Stages 4 and 5 on a design originally developed by dRMM Architects for a Central Logistics Facility, transport hub and multi-storey car park on the Sky Campus. The 70x50m building included warehousing, staff arrival changing and shower facilities for male and female employees, bus pick up and drop off provision and access for pedestrians, cyclists, car drivers, coaches and articulated lorries. The 5m lower section of the building was faced in textured and ribbed precast concrete panels with the upper levels of the car park obscured with transparent coloured fabric in the Sky corporate colours. The building was completed in June 2018. Categories: Commercial Photography © dRMM Architects Location London Sectors Commercial